Solidity
A continuous presence in Rome since 1981. Solidity is not a slogan: it means staying, answering and finishing the work.
OUR HERITAGE
The fixed point. We build the future through proven experience, earned trust and the strength of daily work.

A continuous presence in Rome since 1981. Solidity is not a slogan: it means staying, answering and finishing the work.
The same technical leadership since 1991 and clients who have returned to Polaris with successive commissions.
Complex sites, occupied buildings, and building and services responsibilities met with daily discipline.
A STORY BUILT TO LAST
Polaris has crossed more than four decades without chasing the noise of the moment. It has consolidated structures, renewed operating hotels, transformed institutions and healthcare spaces, and integrated building work with services. Every handover has added a chapter to a reputation earned on site.
Polaris is founded in Rome: work done properly as its foundation.
Hotel Claridge: a sequence of commissions begins in a continuously operating hotel.
Cesare Poggi takes technical leadership, a responsibility he still holds today.
Structural consolidation and services at San Giovanni in Laterano.
An entire wing of the Handmaids of Christ the King is renewed and returned to use.
Fontanile Arenato: four floors, 26 bathrooms, services, façades and roof.
Expertise extends to roofing with asbestos remediation.
UILDM entrusts Polaris with the centre's fire-safety compliance.
A new boiler plant confirms integrated building-services capability.
UILDM spaces become clinics: continuity, precision, a new purpose.
New leadership, an international team and two-shift delivery: Polaris enters the Radisson Blu site.
CONTINUITY
Technical Manager for every D.M. 37/2008 category. Thirty-five years of continuous responsibility: expertise carried across generations of sites.
Signs: declarations of conformity and technical site direction.
A NEW CHAPTER
Since 2026 she has led Polaris with a skilled multilingual team, operational rigour and two-shift working, in the name of technical continuity.
REPEAT TRUST
years of commissions for the Handmaids of Christ the King · 12 projects
commissions for the Adorers of the Blood of Christ · 1990–2000
Hotel Claridge floors renewed while the hotel remained operational
03