OUR HERITAGE

Polaris
since 1981

The fixed point. We build the future through proven experience, earned trust and the strength of daily work.

Contemporary Roman travertine architecture
FOUNDED IN ROME1981
I

Solidity

A continuous presence in Rome since 1981. Solidity is not a slogan: it means staying, answering and finishing the work.

II

Trust

The same technical leadership since 1991 and clients who have returned to Polaris with successive commissions.

III

Hard work

Complex sites, occupied buildings, and building and services responsibilities met with daily discipline.

A STORY BUILT TO LAST

Trust is built when work becomes evidence.

Polaris has crossed more than four decades without chasing the noise of the moment. It has consolidated structures, renewed operating hotels, transformed institutions and healthcare spaces, and integrated building work with services. Every handover has added a chapter to a reputation earned on site.

1981

Polaris is founded in Rome: work done properly as its foundation.

1990

Hotel Claridge: a sequence of commissions begins in a continuously operating hotel.

1991

Cesare Poggi takes technical leadership, a responsibility he still holds today.

1993

Structural consolidation and services at San Giovanni in Laterano.

1997

An entire wing of the Handmaids of Christ the King is renewed and returned to use.

2004

Fontanile Arenato: four floors, 26 bathrooms, services, façades and roof.

2009

Expertise extends to roofing with asbestos remediation.

2016

UILDM entrusts Polaris with the centre's fire-safety compliance.

2018

A new boiler plant confirms integrated building-services capability.

2021

UILDM spaces become clinics: continuity, precision, a new purpose.

2026

New leadership, an international team and two-shift delivery: Polaris enters the Radisson Blu site.

CONTINUITY

Cesare Poggi

Technical Director since 25 October 1991

Technical Manager for every D.M. 37/2008 category. Thirty-five years of continuous responsibility: expertise carried across generations of sites.

Signs: declarations of conformity and technical site direction.

A NEW CHAPTER

Patrycja Mila

Managing Director since 2026

Since 2026 she has led Polaris with a skilled multilingual team, operational rigour and two-shift working, in the name of technical continuity.

REPEAT TRUST

A returning client is the strongest evidence.

25

years of commissions for the Handmaids of Christ the King · 12 projects

15

commissions for the Adorers of the Blood of Christ · 1990–2000

5

Hotel Claridge floors renewed while the hotel remained operational

03

The Polaris method

  1. 01

    Survey and diagnosis

  2. 02

    Detailed design and phased site planning

  3. 03

    Integrated building and services delivery

  4. 04

    Testing and compliance

  5. 05

    Documented handover