Servants of Saint Joseph
Servants of Saint Joseph
Seventeen en-suite rooms, boiler and hot water plant, external lift, façades, roof and terraces.
背景
Seventeen en-suite rooms, boiler and hot water plant, external lift, façades, roof and terraces.
工程内容
分阶段策划、界面协调、土建与机电施工、检测以及带文件的交付。
