Servants of Saint Joseph

Servants of Saint Joseph

Seventeen en-suite rooms, boiler and hot water plant, external lift, façades, roof and terraces.

2010

背景

Seventeen en-suite rooms, boiler and hot water plant, external lift, façades, roof and terraces.

工事内容

工程計画、界面の調整、躯体と設備の施工、試験、文書を伴う引き渡し。