Handmaids of Christ the King — 850 kW boiler plant

Handmaids of Christ the King — 850 kW boiler plant

Replacement of an 850 kW boiler plant.

2018

背景

Replacement of an 850 kW boiler plant.

工事内容

工程計画、界面の調整、躯体と設備の施工、試験、文書を伴う引き渡し。